martes, 20 de septiembre de 2011

FIBER OPTIC TERMINATION, CABLE ASSEMBLIES AND INSTALLATION: NASA-STD 8739.5


1. SCOPE

2. APPLICABLE DOCUMENTS

3. DEFINITIONS AND ACRONYMS

4. GENERAL
4.2 Documentation
4.3 Approval of Departures from this Standard
4.4 Rework and Repair

5. TRAINING AND CERTIFICATION PROGRAM
5.2 Vision Requirements
5.3 Certification Levels
5.4 Training Program Requirements
5.5 Documentation
5.6 Maintenance of Certification Status
5.7 Training Resources

6. FACILITIES, EQUIPMENT AND MATERIALS
6.1 Facility Cleanliness
6.2 Environmental Conditions
6.3 Tools and Equipment
6.4 Tool and Equipment Control
6.5 Inspection Aids
6.6 Storage and Handling
6.7 Electrostatic Discharge Requirements
6.8 Materials Selection
6.9 Solvents
6.10 Adhesives
6.11 Material Shelf Life Requirements
6.12 Personnel Protection

7. OPTICAL FIBER END PREPARATION
7.2 Safety Requirements
7.3 Procedures

8. CLEANING

9. FIBER OPTIC SPLICING
9.2 Splice Assembly
9.3 Design Considerations

10. FIBER OPTIC CABLE ASSEMBLIES
10.2 Cable Assembly
10.3 Post Assembly Testing
10.4 Design Considerations

11. FIBER OPTIC ASSEMBLIES
11.2 Fiber Optic Connector Termination
11.3 Post Fiber Optic Connector Termination
11.4 Fiber Optic Routing
11.5 Fiber Optic Assembly Testing
12. FIBER OPTIC CABLE ASSEMBLY INSTALLATION

12.1 General 12.2 Installation Requirements For Flight Applications
12.3 Installation Requirements for Mission Critical Ground Support Applications

13. QUALITY ASSURANCE PROVISIONS
13.2 Magnification Requirements
13.3 Documentation Verification
13.4 Documentation Authorization
13.5 Verification Of Tools And Equipment, Material, And Facilities
13.6 Verifications
13.7 Inspections
13.8 Tests

No hay comentarios:

Publicar un comentario